Select Page

Program Evaluation and Review Technique (PERT) is a project management technique used to plan, schedule, and control complex projects. Developed in the late 1950s by the U.S. Navy in collaboration with Booz Allen Hamilton, PERT is particularly useful for projects with high uncertainty and variability in activity durations. It helps project managers analyze the time required to complete each activity and identify the critical path through the project network. Here’s an overview of Programme Evaluation and Review Techniques (PERT):

Key Components of PERT:

  1. Activity Identification:
    • Identify all the activities required to complete the project. Activities are specific tasks or work packages that must be accomplished within the project.
  2. Time Estimation:
    • Estimate the duration of each activity using three time estimates: optimistic time (O), pessimistic time (P), and most likely time (M). These estimates are used to calculate the expected duration of each activity using a weighted average (TE = (O + 4M + P) / 6).
  3. Network Diagram:
    • Create a network diagram (often represented as an Activity-on-Node or AoN diagram) to visualize the project activities and their dependencies. The network diagram helps project managers understand the logical sequence of activities and identify the critical path.
  4. Critical Path Identification:
    • Use the calculated expected durations to determine the earliest start time (ES) and earliest finish time (EF) for each activity using forward pass calculations.
    • Identify the latest start time (LS) and latest finish time (LF) for each activity using backward pass calculations.
    • The critical path consists of activities with zero total float or slack, meaning any delay in these activities will directly impact the project’s overall duration.
  5. Probability Analysis:
    • Assess the probability of completing the project within a given time frame by considering the variability in activity durations. PERT allows project managers to account for uncertainty and risk in project planning and decision-making.

Benefits of PERT:

  • Provides a probabilistic approach to project planning and scheduling, accounting for uncertainty and variability in activity durations.
  • Helps identify the critical path and prioritize resources for activities that have the greatest impact on project duration.
  • Facilitates risk management by assessing the probability of meeting project deadlines and identifying areas of schedule risk.
  • Enables project managers to develop realistic project schedules and manage stakeholder expectations effectively.

Limitations of PERT:

  • Requires accurate estimation of activity durations and dependencies, which may be challenging for complex projects with many unknown variables.
  • May lead to overly optimistic or pessimistic estimates if the three-time estimates are not based on reliable data or expert judgment.
  • Can be time-consuming and resource-intensive to implement, particularly for large and complex projects.

Overall, Programme Evaluation and Review Techniques (PERT) is a valuable project management tool for planning, scheduling, and controlling projects, particularly those with high uncertainty and variability. By using PERT techniques effectively, project managers can improve project planning, mitigate schedule risks, and achieve project objectives within the allocated time and budget constraints.